Project presentation Schedule


     





Sno.

Project title

Report

Present. date

Team members











1

Binary search using 8085 A. lang.

Recvd.

22-Nov

UG201010015






2

Arbitray precision calculator

Recvd.

22-Nov

UG201010011, UG201010012






3

Matrix Multil. in 8085 Assembly lang.

Recvd.

22-Nov

UG201010009, UG201010018






4

Quick-sort using 8085 Assembly lang.

Recvd.

22-Nov

UG201010014, UG201010044






5

Modern traffic control

Recvd.

22-Nov

UG201010028, UG201010041






6

Interpreter for Assembly lang.

Recvd.

22-Nov

UG201010007, UG201010030






7

Stack machine to compute postfix

Recvd.

22-Nov

UG201010033, UG201010034






8

Simulation of general cache memory sys.

Recvd.

22-Nov

UG201010035, UG201010037






9

Interpreter for Assembly lang written in C

Recvd.

22-Nov

UG201010042, UG201010043






10

Stack M/C (zer addr.) to simulate a. lang.

Recvd.

22-Nov

UG201010032, UG201010025






11

Architecture for parity check

Recvd.

22-Nov

UG201010031, UG201010019






12

Case study of mobile processor

Recvd.

22-Nov

UG201010010






13

Implement matrix mult.

Recvd.

23-Nov

UG201010023, UG201010027






14

Arbitray precision arithmetic

Recvd.

23-Nov

UG201010038, UG201010005






15

Quantum computers

Recvd.

23-Nov

UG201010013, UG201010026






16

Quantum Computers

Recvd.

23-Nov

UG201010003






17

Computer keybd as piano

Recvd.

23-Nov

UG201010016, UG201010029






18

Inter preter in for A. lang.

Recvd.

23-Nov

UG201010036, UG201010020






19

PID controller

Recvd.

23-Nov

UG201010001, UG201010002






20

Quick sort

Recvd.

23-Nov

UG201010008






21

Simulation of general cache

Recvd.

23-Nov

UG201010004, UG201010017






22

Architecture for parity checking

Recvd.

23-Nov

UG201010006, UG201010021






23

Interpreter in C++/Java

Recvd.

23-Nov

UG201010022, UG201010024






24

Simulation of modern traffic control sys.

Recvd.

23-Nov

UG201010039, UG201010040






Note: Time for each team 5 minutes (max), highlight only main points in 3-5 slides. The report can be submitted latest by 23-Nov.(1.00 PM). The presentations can be stored on one laptop, and team members of each project will jointly present. The presentation order can be your own also, provided minimum 12 presentations are completed on 22nd Nov.